Just the facts. No fluff. RSS · About
NEW YORK Friday, November 27, 2026

Nation

Bridge-Tunnel, Causeway Closed Amid Thanksgiving Storm

Virginia's Eastern Shore faces severe weather with power outages and flooding warnings.

New York Editorial News Desk November 26, 2026 1 min read

The Brief

  • Chesapeake Bay Bridge-Tunnel and Chincoteague Causeway closed due to storm.
  • 70 power outages affect 2,901 customers as of 5:30 a.m.
  • Evacuation orders issued for flood-prone areas in Chincoteague

The Chesapeake Bay Bridge-Tunnel and Chincoteague Causeway are closed to all traffic on Thursday morning due to the Thanksgiving storm, which is bringing damaging winds, power outages, and rising tides to Virginia’s Eastern Shore.

At East Point, sustained winds were reported at 38 mph, with gusts reaching 55 mph. ANEC reported 70 outages affecting 2,901 customers as of 5:30 a.m., with major outages on Tangier and in lower Northampton County.

ANEC is aware of the outages, but strong winds could delay repairs until crews can work safely. The strongest winds and heaviest rain are expected to begin easing around noon into early afternoon.

Chincoteague ordered residents in flood-prone areas to evacuate Wednesday night. Strong east-northeast winds are pushing water toward seaside communities, where high tide is expected around 9:30 a.m., depending on location.

The National Weather Service continues to forecast potentially historic water levels at Wachapreague, where the tide could exceed the station’s previous recorded maximum. No record has been confirmed in the information available for this report.

Bayside flooding is expected to be generally moderate, but roads in areas that routinely flood could become impassable. Bayside high tides range from approximately 10 a.m. near Cape Charles to 1–2 p.m. farther north.

More in Nation